Do I need a permit in Half Moon Bay?
Tap a project to see when it needs a permit. Licensed contractors usually pull the permit for you - ask that it's included in the quote.
Half Moon Bay Building DivisionApplies inside city limits. El Granada, Montara and Moss Beach are unincorporated: San Mateo County Planning & Building issues those permits.
Inside
Systems & energy
Outside & yard
Up to 4 feet (from the bottom of the footing) usually doesn't, unless it holds extra load.
- Walls over 4 feet, or walls holding up a slope, driveway or building above, need a permit and often an engineer.
Big projects
General guidance based on California's building code - your city can have stricter rules, and zoning, historic and HOA rules can apply too. Check with your city's building department before you start.
Based on the California Residential Code, Section R105.2 (work exempt from permit) and Half Moon Bay's list of work that doesn't need a permit.
Unpermitted work can cause problems when you sell, and insurers may deny related claims.
